Operations Command

Operations Command Center

National field operations, installation pipeline and team intelligence.

Active Installations
14
Site Surveys Today
6
Maintenance Tickets
42
5 critical
Available Engineers
11/16
Inventory Alerts
3
Reorder needed
Delayed Projects
3
Tasks Completed (week)
186
Safety Score
98/100
0 incidents 90d

National Operations Map

Abuja
14 projects
3 teams · 2 delayed · 4 tickets
Lagos
22 projects
4 teams · 0 delayed · 6 tickets
Port Harcourt
9 projects
2 teams · 1 delayed · 8 tickets
Kano
6 projects
1 team · 0 delayed · 1 ticket
Ibadan
7 projects
1 team · 0 delayed · 2 tickets

Installation Pipeline — Stage Flow

Stage 1
Survey
12 projects · 2.1d avg · Team North
Stage 2
Design
8 projects · 3.4d avg · Engineering
Stage 3
Procurement
6 projects · 9.2d avg · 2 delayed
Stage 4
Installation
14 projects · 14.8d avg · Team Alpha/Bravo
Stage 5
Testing
5 projects · 1.8d avg · QA
Stage 6
Handover
4 projects · 0.5d avg · Team Lagos

Installations Timeline

Ticket Status

Team Capacity Heatmap

AvailabilityWorkloadQualitySafetySpeed
Team Alpha
62
92
94
98
88
Team Bravo
48
88
86
96
78
Team Delta
55
80
91
97
82
Team North
78
64
84
95
74
Team Lagos
70
72
90
98
85
AI Intelligence Feed
High
Procurement delay risk

3 projects in PH/Lagos stuck waiting for MPPT controllers — 9 days of slippage.

Action: Expedite supplier shipment from EPEver

High
Team Alpha overcapacity

Operating at 92% utilization — fatigue risk and quality dip likely next sprint.

Action: Reassign PRJ-1041 phase 2 to Team Bravo

Medium
PH QA review

Hospital install requires extra QA cycles before handover.

Action: Schedule joint walkthrough Friday

Low
Ticket volume up 18%

Maintenance tickets rose this week — driven by panel cleaning requests post-Harmattan.

Operations Intelligence Briefing

This week, in numbers

  • Installations are pacing 14% above last month; on-site quality scores remain ≥86 across all teams.
  • Procurement bottleneck (MPPT controllers, lithium cells) is the single biggest risk to August handover dates.
  • Lagos and Abuja regions are healthy; Port Harcourt requires a focused QA + safety attention cycle.
  • Safety streak: 142 days incident-free across 6 active sites — keep the toolbox briefings going.