Operations Command

Safety Command Center

Worksite safety, incident trends, compliance rings and emergency response.

Safety Score
98/100
Days w/o Incident
142
PPE Compliance
100%
Open Risk Items
2

Safety Command Score

98
Overall
PPE compliance100
Electrical safety97
Vehicle safety95
Incident response98
Site readiness96

Incident Trend (12 mo)

Safety Risk Matrix

Rooftop edge
Battery vent (low)
Low impactMediumHigh

Compliance Progress Rings

100
PPE
97
Electric
95
Vehicle
96
Site
92
Emergency

Emergency Response Workflow

Stage 1
Incident
Auto + manual
Stage 2
Report
<15 min
Stage 3
Investigation
Safety lead
Stage 4
Corrective Action
Within 7d
Stage 5
Closure
Verified

Safety Checklist (Today)

PPE issued to all teams (helmet, gloves, harness)
Tool inventory verified for each team
Site risk assessment completed
Emergency contacts updated
First aid kit checked
Fire extinguishers serviced

Electrical Safety Checklist

DC isolation verified
AC breakers labeled
Grounding tested
Surge protection installed
Cable insulation OK

Recent Safety Alerts

  • • Rooftop edge protection at PRJ-1043 — pending guardrails (Medium)
  • • Battery room ventilation at PRJ-1044 — to upgrade (Low)
AI Intelligence Feed
Medium
Rooftop edge protection — PRJ-1043

Install guardrails before phase 2 begins to maintain incident-free streak.

Action: Procure and deploy this week

Low
142 days incident-free

Sustain culture — schedule recognition in next all-hands.

Site Safety Intelligence Map

PRJ-1041
Green
Abuja
0 incidents
Routine inspection · next audit Fri
PRJ-1042
Green
Lagos
0 incidents
Stable · monitoring battery vent
PRJ-1043
Amber
Port Harcourt
1 incidents
Install rooftop guardrails before Phase 2
PRJ-1044
Red
Kano
2 incidents
Halt rooftop work · escalate to Safety Lead
PRJ-1045
Green
Ibadan
0 incidents
Commissioning under QA sign-off

Incident Root Cause Wheel

Root Cause
Wheel
Human Error34%
Equipment22%
Training18%
Environment12%
Process14%

Safety Culture Score

Reporting
92
Training
88
Compliance
96
Audits
84
Combined Safety Culture Score
90/ 100 — Strong culture, audit cadence is the lift area
Operations AI Advisor
Confidence 96%

Rooftop edge protection required at PRJ-1043 before Phase 2 begins. Kano (PRJ-1044) has two recent incidents tied to harness misuse — same root cause cluster as Q1 2025. Without intervention this week, the 142-day streak is at risk.

Recommended next step: Deploy guardrails to PRJ-1043 by Thu; mandate refresher harness training for Team North before Mon.
Live Intelligence Feed
streaming
  • 06:30All teams completed toolbox briefing
  • 08:15PRJ-1043 — guardrail order still pending
  • 09:42Near-miss reported · Kano rooftop
  • 11:10PPE compliance check passed all sites
  • 13:25Quarterly audit scheduled — Jun 28